Pressure Zone Change Area 7
Sector: Water Supply and Storage • Location: Victorville, California, United States of America
Source: Dodge USA
The scope of work includes the following tasks: Removal and replacement of Pressure Reducing Valve (PRV) Station. Removal and disposal of existing water pipelines, valves, fittings and other appurtenances to reconfigure existing water system. Proper removal and disposal of asbestos-cement pipe shall be the Contractor s responsibility. Installation of 8 , 12 and 14 pipes, valves and fitting along w
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bidding |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The scope of work includes the following tasks: Removal and replacement of Pressure Reducing Valve (PRV) Station. Removal and disposal of existing water pipelines, valves, fittings and other appurtenances to reconfigure existing water system. Proper removal and disposal of asbestos-cement pipe shall be the Contractor s responsibility. Installation of 8 , 12 and 14 pipes, valves and fitting along with other appurtenances including, but not limited to fire hydrant, blow off and combination air ... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
