Previously Produced Fields (PPF) Project Redevelopment
One of 3,097 projects Taiyo tracks in Norway.
Source: Offshore Engineer Magazine
The PPF project involves the joint redevelopment of the Albuskjell, Vest Ekofisk and Tommeliten Gamma offshore fields through a subsea tie-back to the existing Ekofisk Complex in the North Sea. The development includes 11 new wells from four subsea templates connected through a shared pipeline system, expected to recover between 90 million and 120 million barrels of oil equivalent of gas and conde
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Norway
- Updated
- 22 Jul 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Previously Produced Fields (PPF) Project Redevelopment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The PPF project involves the joint redevelopment of the Albuskjell, Vest Ekofisk and Tommeliten Gamma offshore fields through a subsea tie-back to the existing Ekofisk Complex in the North Sea. The development includes 11 new wells from four subsea templates connected through a shared pipeline system, expected to recover between 90 million and 120 million barrels of oil equivalent of gas and condensate resources. First production is planned for the fourth quarter of 2028. |
Original sector | Energy |
Location
Country | Norway |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
