logo
ProjectClosed

Primary Deck WRH Piping Replacement

Closed · California · Last reported Jul 2025

Source: Dodge

The service water for the primary deck is supplied from a single 4 WRH (Reclaimed Water High Pressure) line, which provides high-pressure water for scum removal spray systems and hose water outlets at each of the 12 primary tanks. Each tank is supplied by a branch pipe (either 3 or 4 ) connected to the main 4 WRH header, which then reduces to a 2 SRW (Scum Removal Water) pipe that feeds the PVC sp

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Government, Commercial
Location
Elk Grove, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Primary Deck WRH Piping Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Primary Deck WRH Piping Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Elk Grove, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The service water for the primary deck is supplied from a single 4 WRH (Reclaimed Water High Pressure) line, which provides high-pressure water for scum removal spray systems and hose water outlets at each of the 12 primary tanks. Each tank is supplied by a branch pipe (either 3 or 4 ) connected to the main 4 WRH header, which then reduces to a 2 SRW (Scum Removal Water) pipe that feeds the PVC spray header inside each primary tank. The primary tank spray system is designed to push scum forwa...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Elk Grove

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project