Primary Digester and Clarifier Rehabilitation
Sector: Steel • Location: Nampa, Idaho, United States of America
Source: Dodge USA
The Work includes removing the floating steel cover from Primary Digester No. 4, removing the existing protective coating on the underside of the steel cover, and on the exterior of the side sheets, and preparing the surface for new coating, removing and replacing corroded ballast supports per original manufacturer s requirements, and as directed by the Owner and Engineer, re-coating the floating
- Status
- Prospective
- Sector
- Steel, Manufacturing (Industrial), Government, Rail, Metal, Commercial
- Location
- Nampa, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Primary Digester and Clarifier Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work includes removing the floating steel cover from Primary Digester No. 4, removing the existing protective coating on the underside of the steel cover, and on the exterior of the side sheets, and preparing the surface for new coating, removing and replacing corroded ballast supports per original manufacturer s requirements, and as directed by the Owner and Engineer, re-coating the floating steel cover, and re-installing the floating steel cover onto the digester tank. The Work also inc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Nampa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Manufacturing (Industrial), Government, Rail, Metal, Commercial |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
