logo
ProjectStart

Primary Grid 676 Hot Mix Surfacing Structure and Patching

One of 10,000+ projects Taiyo tracks in Saskatchewan.

Source: Dodge USA

Primary Grid #676 Hot Mix Surfacing Structure and Patching. 86,000 m2 Subgrade Preparation and Compaction 43,000 tonnes of Type 6 Sub-Base Course in place in Place (Contractor Supply) 27,000 tonnes of Type 33 Soil Stabilized Gravel Base Course in Place (Contractor Supply) 90 tonnes Bituminous Prime, Tack and Flush Coat 14,500 tonnes Type 72 Fiber Reinforced - Hot-mix Bituminous Surface Course in P

Status
Under Construction
Sector
Road, Government, Commercial, Manufacturing (Industrial)
Location
Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Primary Grid 676 Hot Mix Surfacing Structure and Patching

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Primary Grid 676 Hot Mix Surfacing Structure and Patching” is an infrastructure initiative in the Road sector, located in Saskatchewan, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Primary Grid #676 Hot Mix Surfacing Structure and Patching. 86,000 m2 Subgrade Preparation and Compaction 43,000 tonnes of Type 6 Sub-Base Course in place in Place (Contractor Supply) 27,000 tonnes of Type 33 Soil Stabilized Gravel Base Course in Place (Contractor Supply) 90 tonnes Bituminous Prime, Tack and Flush Coat 14,500 tonnes Type 72 Fiber Reinforced - Hot-mix Bituminous Surface Course in Place (Contractor Supply Aggregate) 1,500 m2 of Asphalt Milling

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Saskatchewan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Government, Commercial, Manufacturing (Industrial)

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project