logo
ProjectClosed

Primary School Lux / EVA architecten

The status, timeline and source of this project. A free account opens every field.

Source: ArchDaily

The façade is pulled around the building like elastic bands and, in addition to being eaves, also functions as a canopy or connecting element. Where on Stauntonstraat the extensions dominated the façade, attention now goes to the in-between spaces, the patios, which form a beautiful transition between corridor and public space. Where the two building wings meet, we open up the space again for a be

Status
Closed
Sector
Education, Geothermal, Residential, Cement, Commercial, Warehouse
Location
Netherlands
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Primary School Lux / EVA architecten

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Primary School Lux / EVA architecten” is an infrastructure initiative in the Education sector, located in The Netherlands. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The façade is pulled around the building like elastic bands and, in addition to being eaves, also functions as a canopy or connecting element. Where on Stauntonstraat the extensions dominated the façade, attention now goes to the in-between spaces, the patios, which form a beautiful transition between corridor and public space. Where the two building wings meet, we open up the space again for a beautiful meeting space that connects the two outdoor spaces. At this location, the canopy literally connects both wings into one school and forms a covered outdoor space for dry play and as an extension of the meeting space. Where the canopy is pulled up in a flowing line, we hide the installations on the roof and mark the new main entrance. Prominent, visible and proud on the Stauntonstraat.An air heat pump is used to heat the school. The group rooms are heated by underfloor heating with additional preheated air from a central air treatment. For the gymnasium, a Frenger ceiling provides heating/cooling with a separate air treatment for ventilation. Together with the optimisation of the thermal shell, the school meets the ENG criteria in accordance with the current Building Decree 2012 (new construction).Text description provided by the architects.The school building of SO Lux on the Stauntonstraat in theUtrechtdistrict of Zuilen was realized in 1973 and no longer meets the current wishes for special education in terms of spatial and functional aspects. In addition, the building is very outdated. It has been decided to renovate the building. The current school is characterized as a single-storey building that extends over the entire location in two wings. Due to these low buildings, the function of the building is difficult to read, and there is no clear recognition of an entrance. In the school, the group rooms are adjacent to long corridors without a 'heart' or meeting space. The design was developed from the existing cross-section. The corridor zones on Stauntonstraat are lower than the adjacent group rooms. By organizing all the new installations here, we can reach both the corridor zones and the group rooms and the insulated shielding of these creates a new façade that we use for the architecture.The main load-bearing structure of the school consists of masonry columns with a load-bearing wall every three grids. In the design, the group rooms are reduced to two grids for the small groups in which lessons are taught. The third grid forms the link with the adjacent group room and includes a side room and a toilet room that is directly adjacent to the group room. This way, the teacher maintains an overview of the group. Around the main entrance are the offices where we have housed the more specialist care, such as speech therapy and play supervision, in the existing extensions. The team room is somewhat sheltered, adjacent to the new heart.

Location

Country

Netherlands

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Education, Geothermal, Residential, Cement, Commercial, Warehouse

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project