Primary Sedimentation Tanks E-4 and E-5
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The construction of two additional Primary Sedimentation Tanks is necessary to increase the plant s primary treatment peak capacity to 600 million gallons per day (MGD) during wet weather events, which will increase the total number of Primary Sedimentation Tanks from nine to eleven. The dimensions of the two new tanks will match the dimensions of the most recently constructed tank, which is W-4.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial
- Location
- Pittsburgh, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Primary Sedimentation Tanks E-4 and E-5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The construction of two additional Primary Sedimentation Tanks is necessary to increase the plant s primary treatment peak capacity to 600 million gallons per day (MGD) during wet weather events, which will increase the total number of Primary Sedimentation Tanks from nine to eleven. The dimensions of the two new tanks will match the dimensions of the most recently constructed tank, which is W-4. The FDC will be responsible for designing the new tanks and operationally integrating them with t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Pittsburgh |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
