Primavera Office / ARK7 Architects
Sector: Electric Vehicles (EVs)
Source: ArchDaily
Text description provided by the architects.Primavera Office, the first LEED Platinum certified building in Florianópolis/SC, is a commercial building designed to provide thermal comfort, indoor air quality, and easy access to transportation and services. It also offers infrastructure for electric vehicle charging, bicycle racks and changing rooms, and open spaces for socialization, among other su
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Car parking, Residential, Automotive, Geothermal, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Primavera Office / ARK7 Architects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Text description provided by the architects.Primavera Office, the first LEED Platinum certified building in Florianópolis/SC, is a commercial building designed to provide thermal comfort, indoor air quality, and easy access to transportation and services. It also offers infrastructure for electric vehicle charging, bicycle racks and changing rooms, and open spaces for socialization, among other sustainable strategies. The project consists of 4 standard floors and a duplex floor with a mezzanine, totaling 6 stories. It also features a ground floor, 2 underground parking levels, and a rooftop configured as a commercial space. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Car parking, Residential, Automotive, Geothermal, Commercial |
Article published date | 2026-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects
- Misericordia Health Centre Phase 1
- X2222-01 Construct Direct Current Fast Charging Stations-Montauk & Roaring River State Parks
- Beyond Food Mart
- 5002 Petaluma Blvd North Retail Campus
- The Haven at Deer Creek
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
