logo

Prime 1 – 132 kV Transmission Line Project

Sector: Power Generation (CCGT) • Location: Ethiopia

Source: Wire & Cable India

Project
Awarded

KEC International Ltd has signed a contract with Ethiopian Electric Power (EEP) for the Prime 1 – 132 kV transmission line project in Ethiopia. The project spans approximately 170 km across three sections and aims to strengthen regional power connectivity and support the country’s expanding energy network.

Status
Closed
Sector
Power Generation (CCGT)
Location
Ethiopia
Updated
22 Jul 2026
Source
Wire & Cable India

ConstructChat

Ask ConstructChat about Prime 1 – 132 kV Transmission Line Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Prime 1 – 132 kV Transmission Line Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ethiopia. Taiyo aggregates data on it from Wire & Cable India.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

KEC International Ltd has signed a contract with Ethiopian Electric Power (EEP) for the Prime 1 – 132 kV transmission line project in Ethiopia. The project spans approximately 170 km across three sections and aims to strengthen regional power connectivity and support the country’s expanding energy network.

Original sector

Energy

Location

Country

Ethiopia

Source

Source

Wire & Cable India

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-04-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project