logo
ProjectBidding

Prime and Chip Surface Treatment

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The tendered price shall include Operator(s) and Unit(s). Schedule A-2020 on Page 9 (attached) delineates seven (7) segments of road within the Municipality of Magnetawan, constituting a total 2040 linear meters. 500m require pulverization, base build up and a double lift of tar and chip. One segment being an intersection improvement will only require 100mm of A-Gravel base build up and a double l

Status
Prospective
Sector
Commercial, Government, Road, Manufacturing (Industrial)
Location
Toronto, Ontario, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Prime and Chip Surface Treatment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prime and Chip Surface Treatment” is an infrastructure initiative in the Commercial sector, located in Toronto, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The tendered price shall include Operator(s) and Unit(s). Schedule A-2020 on Page 9 (attached) delineates seven (7) segments of road within the Municipality of Magnetawan, constituting a total 2040 linear meters. 500m require pulverization, base build up and a double lift of tar and chip. One segment being an intersection improvement will only require 100mm of A-Gravel base build up and a double layer of tar and chip applied. Surface width is generally 6.2m. The Granular A quantity is estimat...

Procurement method

Location

Country

Canada

State

Ontario

City

Toronto

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Government, Road, Manufacturing (Industrial)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project