Primrose Trail Reconstruction REBID
Sector: Car parking • Location: Anchorage, Alaska, United States of America
Source: Dodge USA
This project is comprised of all required labor, equipment and materials necessary to perform the following work including but not limited to: reconstruction and deferred maintenance of a 5-mile section of the Primrose Trail on the Chugach National Forest (CNF). Work included is reconstruction of 5 miles of brushing and general restoration, replacement of pundheon, turnpikes, drainage structures,
- Status
- Closed
- Sector
- Car parking, Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Road, Automotive, Rail, Commercial
- Location
- Anchorage, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Primrose Trail Reconstruction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is comprised of all required labor, equipment and materials necessary to perform the following work including but not limited to: reconstruction and deferred maintenance of a 5-mile section of the Primrose Trail on the Chugach National Forest (CNF). Work included is reconstruction of 5 miles of brushing and general restoration, replacement of pundheon, turnpikes, drainage structures, and repair of stream fords. The project location is approximately 13 miles south of the community... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Anchorage |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Waste Processing and Treatment, Water Supply and Storage, Mass Transit, Road, Automotive, Rail, Commercial |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
