Primus Wind Project
Sector: Power Generation (CCGT) • Location: Colorado, United States
Source: Stock Titan
The 49.5 MW Primus Wind Project in Colorado is making positive progress with signed interconnection agreements and is considered a near-term project for Revolve.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Wind
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Stock Titan
ConstructChat
Ask ConstructChat about Primus Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 49.5 MW Primus Wind Project in Colorado is making positive progress with signed interconnection agreements and is considered a near-term project for Revolve. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Stock Titan |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind |
Article published date | 2025-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Midcontinent Express Pipeline (MEP), Oklahoma
- Jacksonville LNG Project, Jacksonville, Florida
