Prince Edward Island Waste Processing Facility
Sector: Biomass • Location: Charlottetown, Prince Edward Island, Canada
Source: Construct Connect
A new $170-million waste processing facility on Prince Edward Island that will convert municipal solid waste and scrap wood into power for the province's district energy network. The facility will process 90% of the province's black cart residential waste, diverting up to 49,000 tonnes of solid waste from landfill annually. It will replace an existing 40-year-old facility and provide power and hea
- Status
- Under Construction
- Sector
- Biomass, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential
- Location
- Charlottetown, Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Construct Connect
ConstructChat
Ask ConstructChat about Prince Edward Island Waste Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A new $170-million waste processing facility on Prince Edward Island that will convert municipal solid waste and scrap wood into power for the province's district energy network. The facility will process 90% of the province's black cart residential waste, diverting up to 49,000 tonnes of solid waste from landfill annually. It will replace an existing 40-year-old facility and provide power and heating to over 145 connected buildings in Charlottetown. Construction is planned to start with foundation work in early 2026 and complete by spring 2028, with commissioning in summer 2028. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
City | Charlottetown |
Source
Source | Construct Connect |
URL |
More Details
Record type | Project |
Sector | Biomass, Waste Processing and Treatment, Power Generation (CCGT), Government, Residential |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in Canada
- Solid Waste Management Strategy
- BioExx Canola Oilseed and Protein Facility
- Enerkem Varennes Carbon Recycling
- Claresholm Solar Project Alberta
- Surrey Biofuel Processing Facility Project
- Florenceville-Bristol French Fry Plant Expansion, New Brunswick, Canada
- Aldersyde Bioenergy Facility
- Project Wheatland BioFuel Facility
