Prince George - Aquatic Center Mechanical/Building Envelope Upgrade
Sector: Electric Vehicles (EVs) • Location: British Columbia, Canada
Source: Infrastructure Canada
The Prince George Aquatic Center Mechanical/Building Envelope Upgrade project will upgrade the mechanical system and perform building envelope repairs to the Aquatic Centre. These upgrades will increase insulation, air-tightness, and incorporate renewable energy to make the aquatic facility highly energy efficient and will increase the energy efficiency of the building. The project works will incl
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Water Supply and Storage, Commercial, Automotive
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Prince George - Aquatic Center Mechanical/Building Envelope Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Prince George Aquatic Center Mechanical/Building Envelope Upgrade project will upgrade the mechanical system and perform building envelope repairs to the Aquatic Centre. These upgrades will increase insulation, air-tightness, and incorporate renewable energy to make the aquatic facility highly energy efficient and will increase the energy efficiency of the building. The project works will include: - exterior insulation finish system wall replacement; - triple-pane windows; - roof replacement; - air handling units; - revisions to Existing Heating Water System; - installation of air source heat pump plant; and - installation of electric vehicle charging stations. |
Original sector | Green Energy |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Water Supply and Storage, Commercial, Automotive |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in Canada
- GO Rail Expansion - On-Corridor Works
- Moncton Water Treatment Facility
- Electric Vehicle Charging Station at Mount Forest Municipal Parking Lot
- Electric Vehicle Charging Station at Picton Municipal Parking Lot
- Bloomington GO Station
- Electric Vehicle Charging Station at Memorial Park Arena
- Electric Vehicle Charging Station at Northland Business Centre
- Electric Vehicle Charging Station at Pearson Airport - Terminal 3
