logo
ProjectUnder Construction With Legal Challenges

Prince William Digital Gateway Data Center Project

Sector: Water Supply and Storage • Location: Prince William County, Virginia, United States

Source: Mother Jones

A proposed project to build more than 30 data centers on the edge of a national reserve in Prince William County, Virginia. The project faced local opposition, legal challenges, and a temporary halt in construction due to a zoning voiding in August 2025. Construction resumed after a stay in October 2025 as the case moves towards trial.

Status
Under Construction
Sector
Water Supply and Storage, Data Center, Power Generation (CCGT)
Location
Prince William County, Virginia, United States of America
Updated
22 Jul 2026
Source
Mother Jones

ConstructChat

Ask ConstructChat about Prince William Digital Gateway Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prince William Digital Gateway Data Center Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince William County, Virginia, United States. Taiyo aggregates data on it from Mother Jones.

Participants

Not available for this record.

Status

Original status

under construction with legal challenges

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed project to build more than 30 data centers on the edge of a national reserve in Prince William County, Virginia. The project faced local opposition, legal challenges, and a temporary halt in construction due to a zoning voiding in August 2025. Construction resumed after a stay in October 2025 as the case moves towards trial.

Original sector

Technology

Location

Country

United States of America (USA)

State

Virginia

City

Prince William County

Source

Source

Mother Jones

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Power Generation (CCGT)

Article published date

2025-11-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project