logo
ProjectBid Results

Princeton Phase 4

Bid results · Ontario · Last reported Feb 2025

Source: Dodge

The work comprises of the reconstruction of Main St South, Railway Street East, Wonham Street, Victoria Street East, Elgin Street East, Church Street, Emma Street and County Road 2. The work includes but is not limited to the following: 16417.0 sq.m of road asphalt removal 1915 sq.m of concrete sidewalk removal 3863 tonnes of HL8 base asphalt 7398 tonnes of Granular A 17263 tonnes of Granular B 25

Status
Closed
Sector
Mass Transit, Cement, Rail, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Automotive
Location
Blandford-Blenheim, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Princeton Phase 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Princeton Phase 4” is an infrastructure initiative in the Mass Transit sector, located in Blandford-Blenheim, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work comprises of the reconstruction of Main St South, Railway Street East, Wonham Street, Victoria Street East, Elgin Street East, Church Street, Emma Street and County Road 2. The work includes but is not limited to the following: 16417.0 sq.m of road asphalt removal 1915 sq.m of concrete sidewalk removal 3863 tonnes of HL8 base asphalt 7398 tonnes of Granular A 17263 tonnes of Granular B 2587m of new storm sewer varying from 100mm to 1350mm dia. with storm structures 1431m of 1.5m wide...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Blandford-Blenheim

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Cement, Rail, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Automotive

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project