logo
ProjectClosed

Private Participation Electric Sector

Sector: Power Generation (CCGT) • Location: Haiti

Source: Inter-American Development Bank (IADB)

The project will finance technical, financial and legal consulting services to assist the CMEP in the process of modernization of the public electricity utility, EDH, under a concession contract. The consultants will prepare the bidding documents, the concession contract and other documents regarding investment needs in EDH, that will eventually serve as the basis for soliciting bids for the conce

Status
Closed
Sector
Power Generation (CCGT), Power Transmission, Government
Location
Haiti
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Private Participation Electric Sector

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Private Participation Electric Sector” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Haiti. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will finance technical, financial and legal consulting services to assist the CMEP in the process of modernization of the public electricity utility, EDH, under a concession contract. The consultants will prepare the bidding documents, the concession contract and other documents regarding investment needs in EDH, that will eventually serve as the basis for soliciting bids for the concession. The specific task that will be carried out by the consultants is to review and finalize the documents needed for the international public tender to achieve the modernization of EDH under a concession contract and to review and finalize the concession contract and its annexes, as well as all other documents necessary for the bidding process. The concession contract will place emphasis on aspects such as: (i) the investments to be done by the concessionaire and the uses of such monies; (ii) to ensure the transparency of the process with the purpose of obtaining the best economic results possible, by preparing final non negotiable contracts.

Original sector

ENERGY

Procurement method

Budget

Location

Country

Haiti

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Government

Article published date

2025-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project