PRIVATE POWER UTIL (
Sector: Power Generation (CCGT) • Location: India
Source: World Bank Group
The objectives of the Private Power Utilities (TEC) Project are to provide additional peak generation capacity to meet more of the increasing demand in the Bombay area and reduce Tata Electric Company's (TEC's) dependence on the state's grid; increase the utilization of existing thermal generating units at Trombay and add a gas-based combined cycle plant. The project comprises: (a) a pumped stora
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objectives of the Private Power Utilities (TEC) Project are to provide additional peak generation capacity to meet more of the increasing demand in the Bombay area and reduce Tata Electric Company's (TEC's) dependence on the state's grid; increase the utilization of existing thermal generating units at Trombay and add a gas-based combined cycle plant. The project comprises: (a) a pumped storage unit at the existing Bhira hydroelectric station to generate 150 megawatt (MW) of additional peak power by consuming off-peak thermal power; (b) a 220 kilovolt (Kv) transmission line to carry this power to the license area; (c) a gas-based combined cycle unit of 180 MW at the Trombay thermal power plant; (d) a second flue gas desulphurization (FGD) unit to control the sulphur dioxide emissions from the coal and oil buring Unit No. 5 at Trombay; and (e) a review of design and technical specifications and supervision of construction of the Bhira pumped storage scheme and acquisition of know-how for the extension of the FGD facility at Trombay. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
