logo

PROFITABLE LOW HEAD HYROPOWER

Sector: Power Generation (CCGT) • Location: Spain

Source: EU Funding & Tenders Portal

Project
Ended

Water is one of the basic and essential human needs for almost all economic activities. The water management sector is facing global challenges that require multi-sector solutions. Small hydro energy plays a key role in power generation worldwide, but installing conventional turbines at a micro level is currently not very attractive because of the large initial investment and their low efficiency.

Project Information FAQ

Project Information

3 Q
The project “PROFITABLE LOW HEAD HYROPOWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Water is one of the basic and essential human needs for almost all economic activities. The water management sector is facing global challenges that require multi-sector solutions. Small hydro energy plays a key role in power generation worldwide, but installing conventional turbines at a micro level is currently not very attractive because of the large initial investment and their low efficiency. Our “regenerative variable speed control system” works at variable speed. The installation time is between 1 and 2 days, reducing civil works by 80%. The pay back for the final clients (Mini-hydroelectric plants, Aquaculture Companies, Wastewater treatment plants) is 4 years. Our overall goal is to improve, integrate, implement and certify our current product. The final product will be capable of generating the maximum amount of electricity with a constant efficiency (75%) and will be further used as demonstrator plant for our customers worldwide. We have already completed the following feasibility actions: technological feasibility, work plan for Phase II and an assessment of the market, business model, risks, IP and created a Business Plan. By 2020, small hydro power (SHP) is forecasted to produce 60 TWh per year in Europe with an installed capacity of 17.3 GW. This represents a potential SHP market of over € 6.35 million. Hence the importance to develop new technologies, to enhance existing plants and to build new ones. At Tecnoturbines and Sendekia, we see this as a challenging market opportunity, where our privileged strategic position will give us a competitive advantage to contribute to the expected growth of SHP and to position the SHP as one of the most profitable forms of energy. Based solely on the product validated in this project, we expect that we can increase our turnover significantly by 2020. This is based on our assumption that we can gain a 0.009% market share of the worldwide SHP by 2017 and to expand to 0.04 % by 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data