Programme for Infrastructure Development In Africa (PIDA)
Sector: Water Supply and Storage • Location: Multinational
Source: African Development Bank (AfDB)
The Medium to Long-Term Strategic Framework Study (MLTSF) For Infrastructure Development will establish a common vision among all stakeholders on the way ahead for NEPAD infrastructure program. It aimed at promoting private sector participation in the financing of infrastructure projects and programs and also meeting the economic and social aspirations of NEPAD. The study will provide the decision
- Sector
- Water Supply and Storage, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Programme for Infrastructure Development In Africa (PIDA)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Medium to Long-Term Strategic Framework Study (MLTSF) For Infrastructure Development will establish a common vision among all stakeholders on the way ahead for NEPAD infrastructure program. It aimed at promoting private sector participation in the financing of infrastructure projects and programs and also meeting the economic and social aspirations of NEPAD. The study will provide the decision makers at the levels of NEPAD secretariat, ADB, RECs, sector organizations as well as development partners, with sufficient information and a strategic framework for monitoring the implementation of infrastructure programs/projects under the NEPAD framework and will propose measures to accelerate the implementation of on-going STAP projects. An important role of the MLTSF is to foster cross-fertilization and dissemination of good practices among Regional Economic Committees (RECs) and infrastructure developers. This study will be carried out in two Parts. Part 1 will be carried out over a period of six months and will deal with the recommendations of the STAP review 2003 and 2004 and will also identify infrastructure gaps, in the four sub-sectors: energy, transport, ICT and water of particular relevance for the competitiveness of Africa. Part 2 will be carried out over a period of about eight months, and will propose strategic goals and targets and related options to address Africa’s infrastructure gaps, and will help RECs and sector organizations to prepare medium term to long term strategies and programs to pursue these goals. |
Original sector | Emergency Response |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Cameroon - Transport Facilitation Programme on the Douala – Bangui Corridors
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Nelson Mandela Institutes - African Institutions of Science and Technology Project
