logo

Programme Support Renewable Energy Strategy STEG (Tozeur II)

Sector: Natural Gas • Location: Tunisia

Source: KFW Bank aus Verantwortung

Project
Active

The project includes the construction of a grid-connected photovoltaic system with an installed capacity of 10 MWp near the city of Tozeur. The aim of the measure is the efficient, ecologically and socially acceptable generation of electrical energy and the establishment of power plant-sized PV technology in Tunisia. This will partially avoid climate-damaging CO2 emissions and the import of natura

Project Information FAQ

Project Information

5 Q
The project “Programme Support Renewable Energy Strategy STEG (Tozeur II)” is an infrastructure initiative in the Natural Gas sector, located in Tunisia. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes the construction of a grid-connected photovoltaic system with an installed capacity of 10 MWp near the city of Tozeur. The aim of the measure is the efficient, ecologically and socially acceptable generation of electrical energy and the establishment of power plant-sized PV technology in Tunisia. This will partially avoid climate-damaging CO2 emissions and the import of natural gas. As a reference project, the measure serves as a basis for the further expansion of photovoltaics in Tunisia. Overall, the measure supports Tunisia in implementing its solar plan and its goal of generating 30% of electricity from renewable energies by 2030, and thus in diversifying its electricity mix and increasing energy independence. The project also makes a contribution to ensuring or increasing the security of supply in the electricity sector. In addition to the Tunisian population, the Tunisian economy in particular also benefits from this. The project sponsor is the national energy supply company, the Société Tunisienne de l'Electricité et du Gaz (STEG).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data