Progress Drive Culvert Replacement
Closed · Ohio · Last reported Sep 2024
Source: Dodge USA
This project consists of the removal of the existing steel plate arch culvert under Progress Drive with replacement of a concrete arch together with the necessary appurtenances required, and replacing pavement where necessary.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Metal, Cement, Steel, Government, Waste Processing and Treatment, Commercial
- Location
- Strongsville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Progress Drive Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the removal of the existing steel plate arch culvert under Progress Drive with replacement of a concrete arch together with the necessary appurtenances required, and replacing pavement where necessary. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Strongsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Metal, Cement, Steel, Government, Waste Processing and Treatment, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
