logo
ProjectProposed

Project Cardinal Data Center Campus

Sector: Data Center • Location: Great Falls, Montana, United States

Source: The Electric

A proposed 2 million-square-foot hyperscale data center campus by Ardent TAC Data Centers on a 569-acre site adjacent to the AgriTech Park in Great Falls. The project involves an investment of $1 billion to $1.5 billion, aiming to create 1,500 to 2,000 construction jobs and 150-200 permanent positions. The project requires city annexation and zoning, securing power generation and transmission, and

Status
Prospective
Sector
Data Center, Power Generation (CCGT)
Location
Great Falls, Montana, United States of America
Updated
22 Jul 2026
Source
The Electric

ConstructChat

Ask ConstructChat about Project Cardinal Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Project Cardinal Data Center Campus” is an infrastructure initiative in the Data Center sector, located in Great Falls, Montana, United States. Taiyo aggregates data on it from The Electric.

Participants

Not available for this record.

Status

Original status

Proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed 2 million-square-foot hyperscale data center campus by Ardent TAC Data Centers on a 569-acre site adjacent to the AgriTech Park in Great Falls. The project involves an investment of $1 billion to $1.5 billion, aiming to create 1,500 to 2,000 construction jobs and 150-200 permanent positions. The project requires city annexation and zoning, securing power generation and transmission, and is planned to have initial construction phases online by late 2027 to early 2028 with full buildout by 2030.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

Montana

City

Great Falls

Source

Source

The Electric

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT)

Article published date

2025-06-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project