logo
ProjectWithdrawn

Project Cardinal Data Center Campus

The owner, status and timeline of this project. A free account opens every field.

Source: KRTV

A proposed hyperscale data center campus planned for Great Falls on a 569-acre site at Agritech Business Park, near Malmstrom Air Force Base and the Great Falls Rainbow Power Substation. The project was expected to create 1,500–2,000 construction jobs and 150–200 permanent high-paying jobs, with initial buildings starting construction after 12–18 months of zoning, permitting, and securing power. F

Status
Closed
Sector
Residential, Commercial, Data Center, Power Generation (CCGT), Government
Location
Great Falls, Montana, United States of America
Updated
22 Jul 2026
Source
KRTV

ConstructChat

Ask ConstructChat about Project Cardinal Data Center Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Project Cardinal Data Center Campus” is an infrastructure initiative in the Residential sector, located in Great Falls, Montana, United States. Taiyo aggregates data on it from KRTV.

Participants

Not available for this record.

Status

Original status

withdrawn

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed hyperscale data center campus planned for Great Falls on a 569-acre site at Agritech Business Park, near Malmstrom Air Force Base and the Great Falls Rainbow Power Substation. The project was expected to create 1,500–2,000 construction jobs and 150–200 permanent high-paying jobs, with initial buildings starting construction after 12–18 months of zoning, permitting, and securing power. Full buildout was projected by 2030. However, the project has been withdrawn due to power transmission timeline issues.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Montana

City

Great Falls

Source

Source

KRTV

URL

More Details

Record type

Project

Sector

Residential, Commercial, Data Center, Power Generation (CCGT), Government

Article published date

2025-11-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project