Project Cardinal Data Center Phase 3
Sector: Cement • Location: Yorkville, Illinois, United States of America
Source: Dodge
Spanning approximately 1,037 acres, the Data Center Campus will include up to fourteen (14) data center buildings, two (2) electrical substations, and one (1) utility switchyard, with improvements potentially spread across fourteen (14) phases. Petitioner will install core utilities and site infrastructure, including the utility switchyard, two (2) substations, seven (7) stormwater management basi
- Status
- Prospective
- Sector
- Cement, Car parking, Road, Data Center, Power Transmission, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial), Water Supply and Storage
- Location
- Yorkville, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Project Cardinal Data Center Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Spanning approximately 1,037 acres, the Data Center Campus will include up to fourteen (14) data center buildings, two (2) electrical substations, and one (1) utility switchyard, with improvements potentially spread across fourteen (14) phases. Petitioner will install core utilities and site infrastructure, including the utility switchyard, two (2) substations, seven (7) stormwater management basins, three (3) main access roads with security checkpoints, on-site parking, and perimeter fencing... |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Yorkville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Data Center, Power Transmission, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
