logo
ProjectPlanned

Project Cobalt Green Data Center

One of 10,000+ projects Taiyo tracks in North Carolina.

Source: Independent Tribune

Compass Datacenters plans to build a data center consisting of five buildings on a 350-acre property off Exit 146 along Interstate 40 in Statesville, North Carolina. Each building will be about 270,000 square feet, totaling approximately 1.34 million square feet, and will require 40 megawatts of power each, totaling 200 megawatts. The location is near a Duke Energy substation and transmission line

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Data Center, Road
Location
Statesville, North Carolina, United States of America
Updated
22 Jul 2026
Source
Independent Tribune

ConstructChat

Ask ConstructChat about Project Cobalt Green Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Project Cobalt Green Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Statesville, North Carolina, United States. Taiyo aggregates data on it from Independent Tribune.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Compass Datacenters plans to build a data center consisting of five buildings on a 350-acre property off Exit 146 along Interstate 40 in Statesville, North Carolina. Each building will be about 270,000 square feet, totaling approximately 1.34 million square feet, and will require 40 megawatts of power each, totaling 200 megawatts. The location is near a Duke Energy substation and transmission lines to meet the power needs. Backup power will be provided by 40 generators per building.

Original sector

Data Center

Location

Country

United States of America (USA)

State

North Carolina

City

Statesville

Source

Source

Independent Tribune

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Data Center, Road

Article published date

2025-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project