Project Concha Direct Air Capture (DAC) Hub
Sector: Wind • Location: San Angelo, Texas, United States of America
Source: Dodge USA
To be build in two phases. A direct air capture project using a connect array of Skytree Stratus DAC units and onsite geological carbon storage. First phase targeted to remove 50,000 tons annually. At full operations targeted to remove up to 500,000 tons annually. To be powered by a power purchase agreement for energy from a (possible 115 to over 200 megawatt) new wind farm by Greenalia.
- Status
- Prospective
- Sector
- Wind, Commercial, Oil and Gas, Power Generation (CCGT), Chemical (Industrial), Raw Materials, Manufacturing (Industrial)
- Location
- San Angelo, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Project Concha Direct Air Capture (DAC) Hub
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To be build in two phases. A direct air capture project using a connect array of Skytree Stratus DAC units and onsite geological carbon storage. First phase targeted to remove 50,000 tons annually. At full operations targeted to remove up to 500,000 tons annually. To be powered by a power purchase agreement for energy from a (possible 115 to over 200 megawatt) new wind farm by Greenalia. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Angelo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Commercial, Oil and Gas, Power Generation (CCGT), Chemical (Industrial), Raw Materials, Manufacturing (Industrial) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
