Project Covert - Kaukauna, WI
Sector: Power Generation (CCGT) • Location: Kaukauna, Wisconsin, United States of America
Source: Dodge
The project seeks to construct a 60,000 sq. ft. new warehouse including an 1,800 sq ft office space in Kaukauna, WI. Plans and scope of work are furnished by Immel Construction. Project work includes but is not limited to concrete, masonry, metal studs and gypsum board, doors and hardware, aluminum windows, flooring, painting, acoustical ceilings, toilet partitions, pre-engineered metal building,
- Status
- Closed
- Sector
- Power Generation (CCGT), Metal, Manufacturing (Industrial), Commercial, Steel, Warehouse, Residential, Cement
- Location
- Kaukauna, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Project Covert - Kaukauna, WI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project seeks to construct a 60,000 sq. ft. new warehouse including an 1,800 sq ft office space in Kaukauna, WI. Plans and scope of work are furnished by Immel Construction. Project work includes but is not limited to concrete, masonry, metal studs and gypsum board, doors and hardware, aluminum windows, flooring, painting, acoustical ceilings, toilet partitions, pre-engineered metal building, fire protection, plumbing, HVAC, electrical, earthwork, and paving. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Kaukauna |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Metal, Manufacturing (Industrial), Commercial, Steel, Warehouse, Residential, Cement |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
