Project Double Reed Data Center Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: The Batavian
Project Double Reed is a proposed 2.2 million-square-foot data center development at WNY STAMP in the Town of Alabama. The project includes three two-story buildings on 130 acres, requiring approximately 500 megawatts of electricity and utilizing 12 emergency backup diesel generators. It represents a major expansion from a previous 900,000 square foot proposal. The project aims to use best-in-clas
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Data Center
- Location
- Alabama, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- The Batavian
ConstructChat
Ask ConstructChat about Project Double Reed Data Center Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Double Reed is a proposed 2.2 million-square-foot data center development at WNY STAMP in the Town of Alabama. The project includes three two-story buildings on 130 acres, requiring approximately 500 megawatts of electricity and utilizing 12 emergency backup diesel generators. It represents a major expansion from a previous 900,000 square foot proposal. The project aims to use best-in-class air-cooled technology with zero consumptive water use for cooling and is designed to comply with strict environmental and noise standards. The facility is expected to provide 120 high-paying jobs and support local community programs. |
Original sector | Built Sector |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Alabama |
Source
Source | The Batavian |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Data Center |
Article published date | 2025-12-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Shaw Air Force Base
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
- Texas LNG’s New Liquefied Natural Gas Facility, Brownsville, Texas
- Trunkline LNG Lake Charles Terminal, Louisiana
