logo
ProjectPlanned

Project Double Reed Data Center Expansion

The owner, status and timeline of this project. A free account opens every field.

Source: The Batavian

Project Double Reed is a proposed 2.2 million-square-foot data center development at WNY STAMP in the Town of Alabama. The project includes three two-story buildings on 130 acres, requiring approximately 500 megawatts of electricity and utilizing 12 emergency backup diesel generators. It represents a major expansion from a previous 900,000 square foot proposal. The project aims to use best-in-clas

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Data Center
Location
Alabama, New York, United States of America
Updated
22 Jul 2026
Source
The Batavian

ConstructChat

Ask ConstructChat about Project Double Reed Data Center Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Project Double Reed Data Center Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Alabama, New York, United States. Taiyo aggregates data on it from The Batavian.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Double Reed is a proposed 2.2 million-square-foot data center development at WNY STAMP in the Town of Alabama. The project includes three two-story buildings on 130 acres, requiring approximately 500 megawatts of electricity and utilizing 12 emergency backup diesel generators. It represents a major expansion from a previous 900,000 square foot proposal. The project aims to use best-in-class air-cooled technology with zero consumptive water use for cooling and is designed to comply with strict environmental and noise standards. The facility is expected to provide 120 high-paying jobs and support local community programs.

Original sector

Built Sector

Budget

Location

Country

United States of America (USA)

State

New York

City

Alabama

Source

Source

The Batavian

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Data Center

Article published date

2025-12-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project