Project for connection between Yibin and Zhaotong Expressway
Sector: Commercial • Location: China
Source: World Bank Group
The project started from Sunjiagou, Niujie Town, Yanliang County, and ended in Beizha Town, Zhaotong City, with a total length of 141.25 kilometers. The whole line was built according to the standard of two-way four-lane expressway. The design speed is 80 km/h and the roadbed width is 24.5 m. Simultaneously, the first grass road construction standard is used to build a small grass dam connection l
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project started from Sunjiagou, Niujie Town, Yanliang County, and ended in Beizha Town, Zhaotong City, with a total length of 141.25 kilometers. The whole line was built according to the standard of two-way four-lane expressway. The design speed is 80 km/h and the roadbed width is 24.5 m. Simultaneously, the first grass road construction standard is used to build a small grass dam connection line of 26.54 km, the design speed is 60 km/h, and the roadbed width is 20 m; the estimated total investment is 25.976 billion yuan. The project is divided into the first phase and the second phase of the project. The first phase of the project is from Liangliangzi to Zhaotong. The total length of the route is 96.718 kilometers. The route starts from K144+600 and ends at K242+078.668 (H-1997.83 meters). The design speed is 80 km/h, and the design standard is two-way four-lane. SPV is Zhaotong Yizhao Expressway Investment and Development Co., Ltd., a JV between the sponsor China Water Resources and Hydropower Engineering No.14 Engineering Co., Ltd. (51 %), and the government companies Zhaotong Expressway Investment Development Co., Ltd. (33.53 %) and Zhaotong Highway Investment Co., Ltd. (15.47 %). Total project cost is $ 3.804 billions. The BOT concession has a duration of 33 years. Financial close took place on July 12, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=f1de4825760a4641950124ecfff416c2 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
