Project HEAT - Phases 2-6
Design development · Florida · Last reported Nov 2024
Source: Dodge USA
Phase 2: Construction of two (2) new engine test cells & continuous high-Mach vitiated air flow to simulate more flight-like high-Mach testing conditions - Phases 3: more continuous high-Mach vitiated air flow - Phase 4: Office Building - Phase 5: Office building addition - Phase 6: "Hush House" for controlled aircraft systems testing
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Advanced Electronics, Commercial, Aerospace & Defense, Residential
- Location
- Jacksonville, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Project HEAT - Phases 2-6
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 2: Construction of two (2) new engine test cells & continuous high-Mach vitiated air flow to simulate more flight-like high-Mach testing conditions - Phases 3: more continuous high-Mach vitiated air flow - Phase 4: Office Building - Phase 5: Office building addition - Phase 6: "Hush House" for controlled aircraft systems testing |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Jacksonville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Advanced Electronics, Commercial, Aerospace & Defense, Residential |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
