Project Jupiter
One of 10,000+ projects Taiyo tracks in New Mexico.
Source: Börse Global
Project Jupiter is a microgrid project in Doña Ana County, New Mexico, involving the deployment of solid oxide fuel cells with a capacity of up to 2.45 gigawatts. The project aims to replace traditional gas turbines and diesel generators, significantly reducing NOx emissions by 92% and operating with almost no water consumption. It is part of a partnership between Bloom Energy and Oracle, with pot
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT)
- Location
- New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Börse Global
ConstructChat
Ask ConstructChat about Project Jupiter
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Jupiter is a microgrid project in Doña Ana County, New Mexico, involving the deployment of solid oxide fuel cells with a capacity of up to 2.45 gigawatts. The project aims to replace traditional gas turbines and diesel generators, significantly reducing NOx emissions by 92% and operating with almost no water consumption. It is part of a partnership between Bloom Energy and Oracle, with potential expansion up to 2.8 gigawatts, targeting hyperscalers' need for reliable, off-grid power supply. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | Börse Global |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
