logo

Project Matador Hybrid Dry-Wet Cooling System

Sector: Power Generation (CCGT) • Location: Amarillo, Texas, United States

Source: PR Newswire

Project
Planned

Design and development of hybrid dry-wet cooling towers for Fermi America's 11-gigawatt private energy grid campus, aiming to reduce water use by prioritizing air-based cooling and closed-loop circulation to conserve water resources in West Texas.

Status
Prospective
Sector
Power Generation (CCGT), Water Supply and Storage
Location
Amarillo, Texas, United States of America
Updated
22 Jul 2026
Source
PR Newswire

ConstructChat

Ask ConstructChat about Project Matador Hybrid Dry-Wet Cooling System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Project Matador Hybrid Dry-Wet Cooling System” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Amarillo, Texas, United States. Taiyo aggregates data on it from PR Newswire.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design and development of hybrid dry-wet cooling towers for Fermi America's 11-gigawatt private energy grid campus, aiming to reduce water use by prioritizing air-based cooling and closed-loop circulation to conserve water resources in West Texas.

Original sector

Energy

Location

Country

United States of America (USA)

State

Texas

City

Amarillo

Source

Source

PR Newswire

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Water Supply and Storage

Article published date

2025-12-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project