Project Tango AI Data Center
Sector: Warehouse • Location: Palm Beach County, Florida, United States
Source: WPEC
Project Tango is a proposed 3.6-million-square-foot hyperscale AI data center campus in Loxahatchee, Palm Beach County. The project includes 280,000 square feet of data and information processing, 148,000 square feet of minor utility use tied to cooling equipment, and about 1.15 million square feet of warehouse space. The data center would use a closed-loop cooling system and is projected to becom
- Status
- Denied without prejudice
- Sector
- Warehouse, Power Transmission, Power Generation (CCGT), Data Center, Water Supply and Storage
- Location
- Palm Beach County, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- WPEC
ConstructChat
Ask ConstructChat about Project Tango AI Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | denied without prejudice |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Tango is a proposed 3.6-million-square-foot hyperscale AI data center campus in Loxahatchee, Palm Beach County. The project includes 280,000 square feet of data and information processing, 148,000 square feet of minor utility use tied to cooling equipment, and about 1.15 million square feet of warehouse space. The data center would use a closed-loop cooling system and is projected to become a $34.5 billion asset at build-out over six to seven years, generating about $561 million in tax revenue. The project faced concerns over noise, water use, traffic, and compatibility with the surrounding rural community. |
Original sector | Technology |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm Beach County |
Source
Source | WPEC |
URL |
More Details
Record type | Project |
Sector | Warehouse, Power Transmission, Power Generation (CCGT), Data Center, Water Supply and Storage |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
