Project Tango Data Center
Sector: Warehouse • Location: Loxahatchee, Florida, United States
Source: The Palm Beach Post
Project Tango was a proposed 1-million-square-foot data center near Arden in Loxahatchee, Palm Beach County. The project included 2,346,564 square feet of warehouse space, 1,032,000 square feet for data-information processing use, and 216,000 square feet for minor utility use, totaling 3,594,564 square feet of developed space at the Central Park Commerce Center. Although the Palm Beach County comm
- Status
- Blocked but possible revised approval
- Sector
- Warehouse, Data Center, Power Transmission
- Location
- Loxahatchee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- The Palm Beach Post
ConstructChat
Ask ConstructChat about Project Tango Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | blocked but possible revised approval |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Tango was a proposed 1-million-square-foot data center near Arden in Loxahatchee, Palm Beach County. The project included 2,346,564 square feet of warehouse space, 1,032,000 square feet for data-information processing use, and 216,000 square feet for minor utility use, totaling 3,594,564 square feet of developed space at the Central Park Commerce Center. Although the Palm Beach County commission blocked Project Tango, a smaller or reconfigured data center on the same site is likely, with prior approvals allowing administrative approval for a 200,000-square-foot data-processing facility and potential conversion of warehouse space into data centers without public hearings. |
Original sector | Technology |
Location
Country | United States of America (USA) |
State | Florida |
City | Loxahatchee |
Source
Source | The Palm Beach Post |
URL |
More Details
Record type | Project |
Sector | Warehouse, Data Center, Power Transmission |
Article published date | 2026-07-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
