Project True SStreet PMU Upgrade
Sector: Automotive • Location: Garland, Texas, USA
Source: Dragzine
Project True SStreet, a 2014 Camaro with a supercharged 427 cubic-inch LSX engine, underwent an electrical system upgrade by installing an ECUMaster Power Management Unit (PMU-16) to replace traditional wiring and fuses. This upgrade simplified the wiring, improved reliability, and provided advanced control and diagnostics for various race components such as fuel pumps, cooling fans, ignition syst
- Status
- Closed
- Sector
- Automotive, Energy Storage, Power Generation (CCGT), Road
- Location
- Garland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dragzine
ConstructChat
Ask ConstructChat about Project True SStreet PMU Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project True SStreet, a 2014 Camaro with a supercharged 427 cubic-inch LSX engine, underwent an electrical system upgrade by installing an ECUMaster Power Management Unit (PMU-16) to replace traditional wiring and fuses. This upgrade simplified the wiring, improved reliability, and provided advanced control and diagnostics for various race components such as fuel pumps, cooling fans, ignition system, and more. The PMU was mounted under the passenger side dash, powered from the battery in the trunk, and controlled via an ECUMaster 8-Position CAN Keypad, enhancing trackside diagnostics and overall electrical system performance. |
Original sector | Automotive |
Location
Country | United States of America (USA) |
State | Texas |
City | Garland |
Source
Source | Dragzine |
URL |
More Details
Record type | Project |
Sector | Automotive, Energy Storage, Power Generation (CCGT), Road |
Article published date | 2025-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in USA
- Turnpike Resurfacing Improvements MP 260 to MP 265
- Digital Parking Permit Portal
- Residential Permit Parking Area 'L' and 'S' Establishments
- Curbside Level 2 Electric Vehicle Charging
- Transportation Fact Sheet
- Western Bay Bridge Approach Trolley Overhead Reroute Project
- Alternative Fuel Bus Program
- No. 22 Fillmore and No. 33 Stanyan Trolley Overhead Reconstruction Project
