logo

Prolec GE Waukesha Wayne County Expansion

Sector: Power Generation (CCGT) • Location: Goldsboro, North Carolina, United States

Source: Neuse News

Project
Under Construction

Prolec GE Waukesha is undertaking a $140 million expansion of its Goldsboro facility in Wayne County to increase production capacity of medium power transformers from 220 to 420 units annually. The project includes engineering, construction, and installation of new manufacturing equipment and is expected to create 330 new jobs. The expansion aims to strengthen North America's energy infrastructure

Status
Under Construction
Sector
Power Generation (CCGT), Road, Manufacturing (Industrial)
Location
Goldsboro, North Carolina, United States of America
Updated
22 Jul 2026
Source
Neuse News

ConstructChat

Ask ConstructChat about Prolec GE Waukesha Wayne County Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prolec GE Waukesha Wayne County Expansion” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Goldsboro, North Carolina, United States. Taiyo aggregates data on it from Neuse News.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Prolec GE Waukesha is undertaking a $140 million expansion of its Goldsboro facility in Wayne County to increase production capacity of medium power transformers from 220 to 420 units annually. The project includes engineering, construction, and installation of new manufacturing equipment and is expected to create 330 new jobs. The expansion aims to strengthen North America's energy infrastructure and support growing electrical infrastructure demand.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Goldsboro

Source

Source

Neuse News

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road, Manufacturing (Industrial)

Article published date

2026-03-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project