logo

PROLER: Developing power production from renewable energies

Sector: Power Generation (CCGT) • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Ongoing

The PROLER program assists Mozambique's national electricity company (EDM) in setting up calls for tenders. These calls for tenders enable renewable energy power generation projects to be launched with a total installed capacity of around 120 MW. To date, three solar projects are planned in the north near the cities of Dondo, Nacala, and Lichinga. A fourth site has been chosen for rolling out a wi

Project Information FAQ

Project Information

4 Q
The project “PROLER: Developing power production from renewable energies” is an infrastructure initiative in the Power Generation (CCGT) sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The PROLER program assists Mozambique's national electricity company (EDM) in setting up calls for tenders. These calls for tenders enable renewable energy power generation projects to be launched with a total installed capacity of around 120 MW. To date, three solar projects are planned in the north near the cities of Dondo, Nacala, and Lichinga. A fourth site has been chosen for rolling out a wind power project.To facilitate the implementation of these projects, AFD provides EDM and the Mozambican authorities with technical assistance for preparing and launching calls for tender. This includes conducting all feasibility studies and preliminary environmental and social studies. For private power producing companies that respond to these calls for tender, AFD also proposes establishing a guarantee mechanism to limit the risk of non-payment by the buyer, which is EDM, the national operator.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data