Proposed 1 Million-Barrel-Per-Day Crude Oil Pipeline to British Columbia's Northwest Coast
Sector: Oil and Gas • Location: Calgary, Alberta, Canada
Source: Pipeline and Gas Journal
Canada and Alberta have reached an industrial carbon pricing agreement to facilitate the construction of a proposed 1 million-barrel-per-day crude oil pipeline to British Columbia's northwest coast. The pipeline construction is planned to start by September 2027, contingent on meeting legal obligations including Indigenous consultations and environmental considerations. The deal includes escalatin
- Status
- Prospective
- Sector
- Oil and Gas, Government, Manufacturing (Industrial)
- Location
- Calgary, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Pipeline and Gas Journal
ConstructChat
Ask ConstructChat about Proposed 1 Million-Barrel-Per-Day Crude Oil Pipeline to British Columbia's Northwest Coast
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Canada and Alberta have reached an industrial carbon pricing agreement to facilitate the construction of a proposed 1 million-barrel-per-day crude oil pipeline to British Columbia's northwest coast. The pipeline construction is planned to start by September 2027, contingent on meeting legal obligations including Indigenous consultations and environmental considerations. The deal includes escalating carbon pricing to incentivize emissions reduction and requires the oil industry to build a carbon capture and storage project, which can be phased in over time. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
City | Calgary |
Source
Source | Pipeline and Gas Journal |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Government, Manufacturing (Industrial) |
Article published date | 2026-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
