Proposed Cardinal Road Levee Project
Sector: Manufacturing (Industrial) • Location: California, United States of America
Source: Marin County Department of Public Works (DPW)
The purpose of the Project is to design a flood barrier to reduce observed seepage issues, due in part to rodent burrows. In addition, the project would provide a 100-year level of tidal flood risk reduction for the first half of this century with expected sea level rise.
This project will address seepage through the concrete wall and earthen levee from Flamingo Road to about 1,100 feet downstrea
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of the Project is to design a flood barrier to reduce observed seepage issues, due in part to rodent burrows. In addition, the project would provide a 100-year level of tidal flood risk reduction for the first half of this century with expected sea level rise. This project will address seepage through the concrete wall and earthen levee from Flamingo Road to about 1,100 feet downstream along the left bank of Coyote Creek. The project will assess the problem and suggest possible courses of action. U.S. Army Corps of Engineers built a levee in the 1950s to reduce flood risk due to Coyote Creek overtopping for residents along Cardinal Road. In the 1970s the levee was built higher with concrete blocks. The levee and floodwall are reaching the end of their expected useful life. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Manufacturing (Industrial) projects in United States of America
- Beardslee Blvd Widening
- 2019-ADA Curb Ramps
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- LEGALIZE/CONSTRUCT REAR BATHROOM ADDITION 67 SQ.FT.
- TRACT 8304- BUILDING 12- UNIT 1204-PLAN B2E-ALT-4BD/3BA 2025 SQ FT LIVING,472 GARAGE,11 PORCH, 0 DECK
- VERIZON ANTENNA MODIFICATIONS TO EXISTING TOWER MOUNTED AND GROUND MOUNTED EQUIPMENT
