Proposed Fish Screen Feasibility Study
Archived · United States of America
Source: Grants.gov
The Bureau of Reclamation (Reclamation) intends to issue a cooperative agreement to Garden Highway Mutual Water Company, under the authority of Catalog of Federal Domestic Assistance (CFDA)15.512, P.L. 102-575 Central Valley Project Improvement Act, Sec. 3406 (b)(21) Fish, Wildlife, Improved Water Management & Conservation. The estimated total amount of the agreement is $92,146.00 with Reclamat
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Government, Road, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Proposed Fish Screen Feasibility Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Bureau of Reclamation (Reclamation) intends to issue a cooperative agreement to Garden Highway Mutual Water Company, under the authority of Catalog of Federal Domestic Assistance (CFDA)15.512, P.L. 102-575 Central Valley Project Improvement Act, Sec. 3406 (b)(21) Fish, Wildlife, Improved Water Management & Conservation. The estimated total amount of the agreement is $92,146.00 with Reclamation providing $46,073.00 in Fiscal Year 2015. The purpose of Proposed Fish Screen Feasibility Study is to study the engineering feasibility of constructing a fish screen, including estimated costs of construction and annual and long-term maintenance requirements and costs. This agreement is the first phase of the project where information will be compiled on the existing Feather River diversion, a range of fish screen options and diversion alternatives will be developed and evaluated, and the apparent best alternatives for schematic design and cost estimating will be selected. A maximum of three (3) potential alternatives will be developed at a conceptual level only, and cost estimating will be preliminary and for planning-level activities only. (Refer to the Notice of Intent to Award Announcement No. R14AN20001 for additional information). A Determination by the Government not to compete this proposed financial assistance agreement based upon Departmental Manual 505 DM 2, paragraph 2.14 (B)(2) & (4) is solely within the discretion of the Government. This notice of intent is NOT a request for competitive proposals. Questions concerning this announcement should be directed to Leanne Henderson, Grants Management Specialist, by email at lhenderson@usbr.gov. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Road, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
