Proposed Offset Well No. 24
Sector: Water Supply and Storage • Location: El Reno, Oklahoma, United States of America
Source: Dodge USA
Water System Improvements Proposed Offset Well No. 24 - Quantity Unit Description 20.00 V.F. Drill 20" Diameter 60.00 V.F. Drill 16" Diameter Hole 60.00 V.F. Drill 4" Test Hole 20.00 V.F. 10" O.D. Stainless Steel Screen 40.00 V.F. 10" PVC SDR 17 Certa Lok Well Casing 20.00 V.F. 16" O.D. Steel Surface Casing 1/2" Thick 60.00 V.F. 2" Draw Down Tube 1.00 L.S. Submersible Pump with Variable Frequency
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Water System Improvements Proposed Offset Well No. 24 - Quantity Unit Description 20.00 V.F. Drill 20" Diameter 60.00 V.F. Drill 16" Diameter Hole 60.00 V.F. Drill 4" Test Hole 20.00 V.F. 10" O.D. Stainless Steel Screen 40.00 V.F. 10" PVC SDR 17 Certa Lok Well Casing 20.00 V.F. 16" O.D. Steel Surface Casing 1/2" Thick 60.00 V.F. 2" Draw Down Tube 1.00 L.S. Submersible Pump with Variable Frequency Drive 1.00 L.S. 6" Discharge Piping, Valves, Fittings & Appurtenances 1.00 L.S. Electrical System... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
