logo

Proposed Project Revision & Improvement of the Blackfoot River Management

Sector: Water Supply and Storage • Location: United States of America

Source: Grants.gov

Project
Archived

Task 1 – Technical Analysis of Revised BRMP Methods and Equations The BRMP was implemented to account for water use in Basin 27. Tribal, State, and Federal technical representatives have found that equations used in accounting calculations are producing erroneous results. Water operators are therefore not using methodology mandated by the BRMP and the Tribes may be wasting tribal and non-tribal wa

Project Information FAQ

Project Information

5 Q
The project “Proposed Project Revision & Improvement of the Blackfoot River Management” is an infrastructure initiative in the Water Supply and Storage sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Task 1 – Technical Analysis of Revised BRMP Methods and Equations The BRMP was implemented to account for water use in Basin 27. Tribal, State, and Federal technical representatives have found that equations used in accounting calculations are producing erroneous results. Water operators are therefore not using methodology mandated by the BRMP and the Tribes may be wasting tribal and non-tribal water resources. The formerly relied upon equations are in the process of being revised for the benefit of all water users and will need to be rigorously verified to be accurate for all foreseen managerial and hydrological conditions. Task 2 – Meetings and Negotiations Regular meetings between all stakeholders will be required in order to propose, discuss, and advance BRMP improvements and will involve technical review of proposed plan language and documentation of discussion items. This effort will ultimately result in a revised draft plan that will be presented to decision makers for approval. Task 3 – Water Gage Measurement Quality Control The USGS will take four independent water flow measurements at the Rocky Ford Gage over two days in order to verify measurements taken by the Tribal Water Resource Department (TWRD) and Idaho Power. These measurements will provide the Tribes with data which will assist them in evaluating their efforts and will be incorporated into the BRMP in order to assist them in the development and management of their water resources.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data