logo

PROPWER Power Generation Capacity Expansion

Sector: Oil and Gas • Location: Permian Basin, Texas, United States

Source: AOL

Project
Awarded

ProPetro announced a strategic framework agreement with Caterpillar to secure up to 2.1 gigawatts of additional power generation capacity for PROPWER over five years, aiming for approximately 2.6 gigawatts deployed by 2032. The project supports data center, industrial, and oil and gas sectors with low-emission power solutions. Capital expenditures for PROPWER in 2026 are estimated between $400 mil

Status
Closed
Sector
Oil and Gas, Power Generation (CCGT), Manufacturing (Industrial), Data Center
Location
Permian Basin, Texas, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about PROPWER Power Generation Capacity Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PROPWER Power Generation Capacity Expansion” is an infrastructure initiative in the Oil and Gas sector, located in Permian Basin, Texas, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ProPetro announced a strategic framework agreement with Caterpillar to secure up to 2.1 gigawatts of additional power generation capacity for PROPWER over five years, aiming for approximately 2.6 gigawatts deployed by 2032. The project supports data center, industrial, and oil and gas sectors with low-emission power solutions. Capital expenditures for PROPWER in 2026 are estimated between $400 million and $450 million, with most costs financed through flexible arrangements.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Texas

City

Permian Basin

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Manufacturing (Industrial), Data Center

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project