Prospect-Coleridge-Coso Water and Sewer Pipeline Replacement
Sector: Cement • Location: San Franscisco, California, United States of America
Source: SF Water Power System
Water System ImprovementsProspect, Fair and Coso Avenues and Coleridge StreetSewer Main ImprovementsProspect Avenue from Cortland Avenue to Kingston Street The water work to be performed under this contract includes the installation of 8-inch ductile iron pipe and 24-inch earthquake resistant ductile iron pipe. Individual residences will be connected to the new 8-inch pipeline.The sewer work will
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Water System ImprovementsProspect, Fair and Coso Avenues and Coleridge StreetSewer Main ImprovementsProspect Avenue from Cortland Avenue to Kingston Street The water work to be performed under this contract includes the installation of 8-inch ductile iron pipe and 24-inch earthquake resistant ductile iron pipe. Individual residences will be connected to the new 8-inch pipeline.The sewer work will include replacement of the main pipeline as well as the side sewers to individual residences. The side sewers and catch basins will all be inspected by a remote television camera and the findings added the sewer system database.General workdays and hours are Monday to Friday, 7:00 a.m. to 5:00 p.m.Project Update as of October 6, 2023Sewer Main Work has been completed.Water Main Work has been completed.The asphalt paving has been completed.The concrete road panels at the top of the unit block of Prospect Avenue need to be replaced. The work is scheduled to be done October 10-12. Please see the Public Notice in the Documents Section below.The only other items remaining are the Project "punch list" of small items not completed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
