logo

Prospect-Coleridge-Coso Water and Sewer Pipeline Replacement

Sector: Cement • Location: San Franscisco, California, United States of America

Source: SF Water Power System

Project
Construction

Water System ImprovementsProspect, Fair and Coso Avenues and Coleridge StreetSewer Main ImprovementsProspect Avenue from Cortland Avenue to Kingston Street The water work to be performed under this contract includes the installation of 8-inch ductile iron pipe and 24-inch earthquake resistant ductile iron pipe. Individual residences will be connected to the new 8-inch pipeline.The sewer work will

Project Information FAQ

Project Information

4 Q
The project “Prospect-Coleridge-Coso Water and Sewer Pipeline Replacement” is an infrastructure initiative in the Cement sector, located in San Franscisco, California, United States of America. Taiyo aggregates data on it from SF Water Power System.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Water System ImprovementsProspect, Fair and Coso Avenues and Coleridge StreetSewer Main ImprovementsProspect Avenue from Cortland Avenue to Kingston Street The water work to be performed under this contract includes the installation of 8-inch ductile iron pipe and 24-inch earthquake resistant ductile iron pipe. Individual residences will be connected to the new 8-inch pipeline.The sewer work will include replacement of the main pipeline as well as the side sewers to individual residences. The side sewers and catch basins will all be inspected by a remote television camera and the findings added the sewer system database.General workdays and hours are Monday to Friday, 7:00 a.m. to 5:00 p.m.Project Update as of October 6, 2023Sewer Main Work has been completed.Water Main Work has been completed.The asphalt paving has been completed.The concrete road panels at the top of the unit block of Prospect Avenue need to be replaced. The work is scheduled to be done October 10-12. Please see the Public Notice in the Documents Section below.The only other items remaining are the Project "punch list" of small items not completed. 

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data