Prospect Hill Tin Project Drilling Program
One of 2,872 projects Taiyo tracks in South Australia.
Source: The Australian
Heavy Rare Earths (HRE) is preparing for a drilling program at the South Ridge tin deposit at Prospect Hill in South Australia. The program aims to define a maiden resource estimate for a high-grade tin resource. It will include 24 reverse circulation holes and five diamond holes totaling 2500 meters. The project is South Australia's largest and most advanced tin project, with plans to expand the
- Status
- Prospective
- Sector
- Mining
- Location
- South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- The Australian
ConstructChat
Ask ConstructChat about Prospect Hill Tin Project Drilling Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Heavy Rare Earths (HRE) is preparing for a drilling program at the South Ridge tin deposit at Prospect Hill in South Australia. The program aims to define a maiden resource estimate for a high-grade tin resource. It will include 24 reverse circulation holes and five diamond holes totaling 2500 meters. The project is South Australia's largest and most advanced tin project, with plans to expand the known mineralisation model and conduct metallurgical testing. |
Original sector | Mining |
Location
Country | Australia |
State | South Australia |
Source
Source | The Australian |
URL |
More Details
Record type | Project |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
