Prospect Street Infrastructure Improvements Phase II
Sector: Water Supply and Storage • Location: Chester, Massachusetts, United States of America
Source: Dodge
The Work under this Contract includes, but is not necessarily limited to, the installation of approximately 120 linear feet of 30-inch, 100 linear feet of 18-inch, and 165 linear feet of 12-inch HDPE gravity drain pipe, headwalls, manholes and catch basins. The project also includes but is not limited to demolition and abandonment of existing drain pipe; water main relocation; swales and stone che
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Waste Processing and Treatment, Hydro, Government
- Location
- Chester, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Prospect Street Infrastructure Improvements Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work under this Contract includes, but is not necessarily limited to, the installation of approximately 120 linear feet of 30-inch, 100 linear feet of 18-inch, and 165 linear feet of 12-inch HDPE gravity drain pipe, headwalls, manholes and catch basins. The project also includes but is not limited to demolition and abandonment of existing drain pipe; water main relocation; swales and stone check dams; trench excavation and backfill; disposal of all excess material; trench paving; installa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Chester |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Mass Transit, Commercial, Rail, Waste Processing and Treatment, Hydro, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
