logo

Prospera Place Residential Towers

Sector: Stadium • Location: Kelowna, British Columbia, Canada

Source: Dodge USA

Project
Pre-Design

plans to construct residential towers in the parking lot fronting onto Water Street and Cawston Avenue. The application is seeking an amendment to allow for heights of 13 storeys and 48 metres (tower 1), 22 storeys and 81 metres (tower 2) and 26 storeys and 95 metres (tower 3). The towers would all sit on a 16-metre podium. The development would encompass the entire front parking lot of the arena.

Status
Prospective
Sector
Stadium, Water Supply and Storage, Car parking, Residential, Road, Automotive, Commercial, Manufacturing (Industrial)
Location
Kelowna, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Prospera Place Residential Towers

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Prospera Place Residential Towers” is an infrastructure initiative in the Stadium sector, located in Kelowna, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

plans to construct residential towers in the parking lot fronting onto Water Street and Cawston Avenue. The application is seeking an amendment to allow for heights of 13 storeys and 48 metres (tower 1), 22 storeys and 81 metres (tower 2) and 26 storeys and 95 metres (tower 3). The towers would all sit on a 16-metre podium. The development would encompass the entire front parking lot of the arena. The overall development proposes 457 total residential units including 75 bachelor, 209 one bedr...

Location

Country

Canada

State

British Columbia

City

Kelowna

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Stadium, Water Supply and Storage, Car parking, Residential, Road, Automotive, Commercial, Manufacturing (Industrial)

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project