Prosperidade I Thermal Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
The Brazilian company Imetame Energia was granted the authorization to build and operate a natural-gas fueled power plant located in the state of Bahia, municipality of Camacari (28 MW in total capacity). The power plant was named UTE Prosperidade I. A 35-year authorization contract was granted by the regulatory agency ANEEL in April 2016. In July 2017, the authorization was transferred to Imetame
- Status
- Prospective
- Sector
- Commercial, Geothermal, Natural Gas, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Prosperidade I Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company Imetame Energia was granted the authorization to build and operate a natural-gas fueled power plant located in the state of Bahia, municipality of Camacari (28 MW in total capacity). The power plant was named UTE Prosperidade I. A 35-year authorization contract was granted by the regulatory agency ANEEL in April 2016. In July 2017, the authorization was transferred to Imetame Termeletrica Ltda. The investment committed to the power plant was estimated at US$ 29.4 million (BRL 93.306 million). Financial closure was achieved in early 2017, when the sponsor was granted a loan from the German bank LBBW and the Finnish development bank Finnvera. The amount of the loan was not disclosed. Construction works commenced in January 2017 and were in its final stages as of June 2017. The construction works at the UTE Prosperidade I commenced in March 2017, and operations were expected to begin in early 2018. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. UTE Prosperidade I won the public bidding that took place in August 2015 by offering an average tariff of US$ 64.2/MWh (BRL 214.25/MWh). The project company signed 20-year power purchase agreements with the several electricity distribution companies. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Natural Gas, Power Generation (CCGT), Government |
Article published date | 2024-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia