Prosperidade I Thermal Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Imetame Energia was granted the authorization to build and operate a natural-gas fueled power plant located in the state of Bahia, municipality of Camacari (28 MW in total capacity). The power plant was named UTE Prosperidade I. A 35-year authorization contract was granted by the regulatory agency ANEEL in April 2016. In July 2017, the authorization was transferred to Imetame

Status
Prospective
Sector
Commercial, Geothermal, Natural Gas, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Prosperidade I Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Prosperidade I Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Imetame Energia was granted the authorization to build and operate a natural-gas fueled power plant located in the state of Bahia, municipality of Camacari (28 MW in total capacity). The power plant was named UTE Prosperidade I. A 35-year authorization contract was granted by the regulatory agency ANEEL in April 2016. In July 2017, the authorization was transferred to Imetame Termeletrica Ltda. The investment committed to the power plant was estimated at US$ 29.4 million (BRL 93.306 million). Financial closure was achieved in early 2017, when the sponsor was granted a loan from the German bank LBBW and the Finnish development bank Finnvera. The amount of the loan was not disclosed. Construction works commenced in January 2017 and were in its final stages as of June 2017. The construction works at the UTE Prosperidade I commenced in March 2017, and operations were expected to begin in early 2018. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. UTE Prosperidade I won the public bidding that took place in August 2015 by offering an average tariff of US$ 64.2/MWh (BRL 214.25/MWh). The project company signed 20-year power purchase agreements with the several electricity distribution companies.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Natural Gas, Power Generation (CCGT), Government

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project